Restoration and Renovation: Act II

The demolition in front of the lobby is 75% complete. Interior demolition of the lobby area, removal of the ceiling, floor and ramp will continue over the next two weeks. Electricians are on-site installing conduit in the balcony and attic areas. Pittsburgh Stage will begin removing the rigging at the end of the month.

Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square