Construction Update - Interior Work Ramps Up

Partition framing in the theater building and restrooms/concession area is complete.

  • Light fixture installation in the ballroom and auditorium is approximately 85% complete.

  • Interior framing on the first floor of the west addition is almost complete.

  • Door frame installation throughout the facility is complete.

  • Drywall installation is 65% complete.

  • Installation of wall tiles in the first floor restrooms is almost complete.

  • Installation of floor tiles in the concession area is almost complete.

  • Installation of (2) elevators is ongoing.

  • Plumbing, HVAC, Electrical, and sprinkler line installation will continue.

Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square